Taiwan High Speed Rail(HSR)

◎ Models Installed:SF/SA Series - Submersible Stainless Steel Pumps

                                    AF Series-SUBMERSIBLE SEWAGE / WASTEWATER PUMPS

◎ Description:

Taiwan First BOT project, the biggest transportation construction:  Taiwan High Speed Railroad.It only takes 90 minutes from Kaohsiung to Taipei. There are 8 stations in total. The length of the railway is 345km and the speed of the HSR is designed to travel at 300km per hour. HCP offered several pumps Taoyuan, Taichung and Tainan HSR station project.

Taiwan High Speed Rail(HSR)

Taiwan High Speed Rail(HSR)

Taiwan High Speed Rail(HSR)

Taiwan High Speed Rail(HSR)

© 2023 HCP PUMP MANUFACTURER CO., LTD. All rights reserved.